Meetings & Webinars

List of Meetings

S.No. Subject Date/Time Details Register
1 Invitation for joint Sub-DCC & MF meeting of Fixed Access (FA) division to be held on 26th February 2026 in respect of revision of GR on Valve Regulated Lead Acid (VRLA) Batteries (TEC 67010:2011) 26-02-2026
Register
2 Manufacturer’s Forum of the division is scheduled on Thursday, 17th February 2026 at 11:00 AM to discuss on the draft Test Guide against the standard for GR on Electronic Locator System (TEC 73070:2025) 17-02-2026
Register
3 Manufacturers Forum meeting for revision of Statndard for GR of "40/80 Channel Dense Wavelength Division Multiplexing (DWDM) System with channel bit rate of 100/200 Gbps for core/Metro Network Application (TEC 86070:2021) 04-02-2026
Register
4 An online meeting of Manufacturer’s Forum of the FA division to discuss on the draft Test Guides against the standard GRs i. Solar Photovoltaic Power supply for Telecom Equipments (Standard No. TEC 66090:2025) and ii. Outdoor WeatherProof Rack for Teleco 29-01-2026
Register
5 Notice for invitation for joint Sub-DCC & MF meeting on revision of GR on “SOLAR PHOTO VOLTAIC (SPV) BASED STANDALONE/ HYBRID POWER SUPPLY FOR Wi Fi TERMINALS & OTHER SIMILAR TELECOM TERMINALS, (TEC 66100:2017)” 19-12-2025
Register
6 Advancements in Optical Fibre Technologies 12-12-2025
Register
7 7th meeting of NWG-15 corresponding to ITU-T SG-15 “Network, technologies and infrastructures for transport, access and home” for study period 2025-2028. 20-11-2025
Register
8 DCC meeting scheduled on 06.10.2025 for formulation of Standard for GR on "Route Tracer for Armoured Optical Fibre Cable" 06-10-2025
Register
9 Joint Sub-DCC & MF meeting of FA division for revision of GR on "Solar Photovoltaic (SPV) Power supply for Telecom Equipments" (Standard No. TEC 66090:2017) 24-09-2025
Register
10 Fifth meeting of NWG-15 corresponding to ITU-T SG-15 04-09-2025
Register
11 Joint Sub-DCC and MF meeting for Standard for GR on "Route Tracer for Armoured Optical Fibre Cable 26-08-2025
Register
12 Joint Sub-DCC & MF meeting for revision of standard for GR on “Electronic Locator System TEC 73070:2014" 20-08-2025
Register
13 Joint Sub-DCC & MF meeting of FA division in respect of revision of GR on SMPS Based Power Plant 30-07-2025
Register
14 Fourth meeting of NWG-15 corresponding to ITU-T SG-15 "Networks, technologies and infrastructures for transport, access and home" 29-07-2025
Register
15 Third (3rd) meeting of NWG-15 corresponding to ITU-T SG-15 “Networks, technologies and infrastructures for transport, access and home” for study period 2025-2028 22-05-2025
Register
16 MATCOF meeting of FA Division 19-03-2025
Register
17 DCC meeting of FA Division 18-03-2025
Register
18 Second Meeting of NWG-15 corresponding to ITU-T SG-15 27-02-2025
Register
19 First meeting of NWG-15 for study period 2025-2028 14-02-2025
Register
20 Joint Sub-DCC and MF meeting of FA Division 20-01-2025
Register
21 First meeting of NWG-21 corresponding to ITU-T SG-21 24-12-2024
Register
22 DCC meeting of FA Division 27-11-2024
Register
23 DCC meeting of QT Division 04-10-2024
Register
24 Development Coordination Committee(DCC) meeting of Transmission Division 26-09-2024
Register
25 Joint Sub-DCC and Manufacturers Forum meeting of Tx Division 18-07-2024
Register
26 Sub-DCC & MF meeting of IT Division for revision of GRs-Router and LAN Switch 06-06-2024
Register
27 DCC meeting to discuss the new GR on “Hybrid (AC + DC) Uninterrupted Power Supply System 30-05-2024
Register
28 DCC meeting for formulation of GR of Optical Fibre Cable 17-05-2024
Register
29 Invitation for Workshop on National Trust Centre (NTC) at Sanchar complex, WMS compound, Jayanagar, Bengaluru. 15-05-2024
Register
30 Sub-DCC & MF meeting of FA Division to discuss the New GR on “HYBRID(AC+DC) UNINTERRUPTED POWER SUPPLY SYSTEM TEC 66160:2024 10-05-2024
Register
31 Eighth meeting of NWG-16 corresponding to ITU-T SG-16 21-03-2024
Register
32 12th meeting of NWG-11 corresponding to ITU-T SG-11 03-04-2024
Register
33 DCC meeting of Tx Division for revision of GR Armoured Optical Fibre Cable for Underground Duct Application 21-03-2024
Register
34 Sub-DCC & MF meeting of FA Division to discuss the revision of GR on UPS 21-03-2024
Register
35 DCC meeting of FA Division 15-03-2024
Register
36 DCC meeting on TEC standard for Draft GR on “Hybrid Set-Top Box (STB) with support for Ultra High Definition (UHD) and Virtual Reality (VR) 28-02-2024
Register
37 Television Broadcasting to Mobile Handheld Devices - Direct to Mobile (D2M) Broadcasting 21-02-2024
Register
38 11th National Working Group (NWG)-11 meeting 29-02-2024
Register
39 Invitation for Sub-DCC & MF meeting of C&B Division in respect of formulation of new GR on Hybrid Set-Top Box (STB) with support for UHD and VR 07-02-2024
Register
40 Postponement of MATCOF meeting scheduled for 05.02.2024(11:30AM) to 07.02.2024(03PM) 07-02-2024
Register
41 MATCOF meeting of IoT Division 07-02-2024
Register
42 Sub-DCC & MF meeting of FA Division to discuss the revision of GR on “Lithium Ion Battery for Telecom Applications” 30-01-2024
Register
43 Request to confirm participation" for a meeting on National Trust Center (NTC) for IoT/M2M devices and applications 12-01-2024
Register
44 Invitation for a meeting on National Trust Center (NTC) for IoT/M2M devices and applications on 12.01.2024 (11 AM) at TEC, New Delhi 12-01-2024
Register
45 10th National Working Group (NWG)-11 Meeting 22-11-2023
Register
46 10th Meeting of National Working Group-12 08-11-2023
Register
47 Sub-DCC & MF meeting of IT Division for revision of GRs-PTP GM, PTP Slave and NTP server 26-10-2023
Register
48 8th Meeting of National Working Group-15 19-10-2023
Register
49 Invitation for MATCOF meeting of IoT Division for ER of IoT Gateway 20-11-2023
Register
50 Meeting notice: Revision of ER of PON family of Broadband Equipment: TEC14762308 14-09-2023
Register
51 Sub-DCC and MF meeting of FA Division for GR on Optical Splitter for PON technology 06-09-2023
Register
52 9th NWG-11 Meeting on 12.09.2023 at 03.00 PM 12-09-2023
Register
53 9th meeting of NWG-12 corresponding to ITU-T SG-12 regarding “ Performance, Quality of Service (QoS), Quality of Experience (QoE)" 29-08-2023
Register
54 Meeting notice: Interoperability between OLT and ONT/ONU in a multivendor environment 09-08-2023
Register
55 Ninth Meeting of National Working Group-9 (NWG-9) corresponding to the ITU-T Study Group 9 (SG9) for Study Period 2022-24 regarding "Broadband Cable and TV”. 19-07-2023
Register
56 8th NWG-11 Meeting 30-06-2023
Register
57 7th National Working Group-12 meeting 15-06-2023
Register
58 DCC meeting for formulation of Standard for GR of Optical Fibre Cable 20-06-2023
Register
59 DCC meeting of C&B Division 02-06-2023
Register
60 The fifth meeting of NWG-2 corresponding to ITU-T Study Group-2 regarding “Operational aspects of service provision and telecommunication management” 25-04-2023
Register
61 6th National Working Group(NWG)-11 meeting corresponding to ITU-T Study Group-11 for the study period 2022-2024 10-04-2023
Register
62 Seventh Meeting of National Working Group-9 (NWG-9) corresponding to the ITU-T Study Group 9 (SG9) for Study Period 2022-24 regarding "Broadband Cable and TV”. 29-03-2023
Register
63 Joint Sub-DCC and MF meeting for formulation of Standards for GRs of Optical Fibre Cable 17-03-2023
Register
64 DCC meeting to discuss and finalise the revision of standards (GRs/ IRs) related to PABX products on 14.03.2023 14-03-2023
Register
65 MATCOF of Radio Division for formulation of Essential Requirements for "E-Band Fixed Radio Relay Systems" to be held on March 3rd, 2023 03-03-2023
Register
66 Combined Meeting of the Manufacturers Forum (MF)- Sub DCC of FN Division, TEC 01-03-2023
Register
67 Sub DCC & MF meeting of FA Div for new Standard for GR on "Radio over Fibre Systems" 13-02-2023
Register
68 DCC meeting of FN Division to finalize "Design and Standards for Common Ducts and posts infrastructure along highways and public pathways" 31-01-2023
Register
69 Combined Meeting of the Sub DCC-MF to discuss the “Design and Standards for Common Ducts and Posts Infrastructure along highways and public pathways” 17-01-2023
Register
70 Sub-DCC & MF meeting on new GR on Cryptography System 12-01-2023
Register
71 TSAC meeting to discuss the adoption of TSDSI transposed 3GPP specifications Release-17 into National standard by TEC 20-12-2022
Register
72 Development Coordination Committee(DCC) meeting for finalization of Standard for GR of Optical Spectrum Analyser(No. TEC 88080:2022) 04-11-2022
Register
73 Open House Session on role of Standard Setting Organisation for the Broadcasting Sector in India 10-11-2022
Register
74 Sub-DCC & MF meeting of FA division for new standard for GR on “50G HS PON system for FTTx based broadband applications" 03-11-2022
Register
75 Third meeting of National Working Group (NWG)-2 corresponding to ITU-T Study Group-2 10-10-2022
Register
76 Fifth Meeting of National Working Group-9 (NWG-9) corresponding to the ITU-T Study Group 9 11-10-2022
Register
77 3rd meeting of NWG-11 corresponding to ITU-T Study Group 11 10-10-2022
Register
78 Fourth meeting of National Working Group (NWG)-12 corresponding to ITU-T Study Group-12 28-09-2022
Register
79 DCC meeting of 6GT Division on new GR of QKD System 15-09-2022
Register
80 Development Coordination Committee (DCC) Meeting for revision of Standards for GR of Optical Fibre Cable 02-09-2022
Register
81 Open House Session with stake holders for discussion on accreditation of Labs for testing of CAS and SMS 04-08-2022
Register
82 Meeting of the committee constituted by TEC to prepare “Design and Standards for Common Ducts and Posts Infrastructure to be established along public pathways" 02-08-2022
Register
83 Joint Sub-DCC and Manufacturers’ forum meeting for revision of Standards for GRs of Optical Fibre Cable 19-07-2022
Register
84 Sub-DCC meeting on new GR on QKD System 10-08-2022
Register
85 Design and Standards for Common Ducts and Posts Infrastructure to be established along public pathways for facilitating sharing of ducts and posts infrastructure 06-07-2022
Register
86 Meeting to finalise draft document on National Plan for Distribution of Indian Standard Time to LSPs of DoT 23-06-2022
Register
87 Notice for invitation for DCC meeting in respect of revision of Standard for Energy Consumption Rating and Energy Passport 21-06-2022
Register
88 MATCOF meetings of IoT Division-change of schedule 26-05-2022
Register
89 3 rd meeting of the committee constituted by TEC to prepare “Design and Standards for Common Ducts and Posts Infrastructure to be established along public pathways 23-05-2022
Register
90 Sub-DCC & MF meeting of 6GT Division to be held on 24.05.2022 in respect of revision of Standard for ECR and EP for Telecommunications Products 24.05.2022
Register
91 MATCOF meetings of IoT Division 25-05-2022
Register
92 First meeting of NWG-2 corresponding to ITU-T Study Group - 2 22-04-2022
Register
93 5 th Meeting of 5G Working Group (WG-2) for Smart Water & Sewage/ Sanitation 04-03-2022
Register
94 DCC Meeting for revision of Standards for GRs of Optical Fibre Cable 28-01-2022
Register
95 TEC Virtual interaction with MTCTE Stakeholders 10-01-2022
Register
96 First meeting of committee for formulating standards/ policy for roll out of street infrastructure and small cells in 5G 07-01-2022
Register
97 Meeting of 5G Working Group (WG-5) for SMART HEALTHCARE 17-12-2021
Register
98 Joint Sub-DCC and Manufacturers’ forum meeting for revision of Standards for GRs of Optical Fibre Cable 08-12-2021
Register
99 Meeting of National Working Group (NWG)-12 corresponding to ITU-T Study Group-12 03-12-2021
Register
100 Secretary(T), DoT visit TEC 16.11.2021
Register
101 Observance of Rashtriya Ekta Diwas 31-10-2021
Register
102 Development Coordination Committee (DCC) Meeting - Transmission Division of TEC 29-09-2021
Register
103 Finalizing IoT / ICT standards for Smart cities 30-09-2021
Register
104 Security by Design and NTC 29-09-2021
Register
105 Consultative Committee oneM2M 24-09-2021
Register
106 NWG -20 Meeting 22-09-2021
Register
107 IoT and 5G applications in Smart Grid 20-09-2021
Register
108 Meeting of National Working Group (NWG)-12 corresponding to ITU-T Study Group-12 21-09-2021
Register
109 Meeting of the Consultative Committee for adoption of oneM2M Release 3 specifications 24-09-2021
Register
110 IoT and 5G applications in Smart Grid 09-09-2021
Register
111 MATCOF meeting of FA division for ER on PON 20-08-2021
Register
112 WG meeting on Security by design Principles in M2M device manufacturing & NTC 31-08-2021
Register
113 Virtual meeting for "Finalizing IoT / ICT standards for Smart cities" 16-08-2021
Register
114 Virtual meeting of Working Group on “IoT and 5G applications in Smart Grid” 09-08-2021
Register
115 Virtual Meeting of Consultative Committee for adoption of oneM2M rel 3 standards. 12-08-2021
Register
116 Launch of Revamped TEC Website on 14-07-2021 14-07-2021
Register
117 Drafting session for Working Group on “IoT and 5G applications in Smart Grid” 23-07-2021
Register
118 MATCOF meeting of IT Division for ER of COTS Server 15-07-2021
Register
119 Inspiring Innovation with TEC & IEEE Publication & eLearning Library Jul 6, 2021, 11:00 AM - Training session 06-07-2021
Register
120 Virtual Conference & interaction with TEC on Mandatory Testing Latest revised procedures 29-06-2021
Register
121 DCC meeting of NGS Division 23-06-2021
Register
122 Management Review Meeting 15-12-2020
Register
123 joint Sub-DCC and MF Meeting 25-11-2020
Register
124 Management Review Meeting 17-08-2020
Register

Webinars

Conferences