Draft Standard on "Metal free Ribbon Optical Fibre Cable with Double HDPE Sheath for underground duct application(Type-I & Type-II)" (Standard No. TEC 85241:2023)
10-02-2023
19-02-2023
2
Draft Standard on "Metal free Optical Fibre Cable with Double HDPE Sheath for underground duct application(Type-I & Type-II)" (Standard No. TEC 85240:2023)
10-02-2023
19-02-2023
3
Draft Standard for "Radio over Fibre"
25-01-2023
12-02-2023
4
Interface Requirements for Non Geostationary satellite orbit (NGSO) based communication networks
27-12-2022
12-01-2023
5
Inviting comments on the draft Telecom Rules pertaining to Section 23 (Power to prescribe standards) of draft Indian Telecommunication Bill, 2022 of DoT
30-12-2022
01-02-2023
6
Draft Standard for assessing and rating Artificial Intelligence Systems for fairness
29-12-2022
13-02-2023
7
Draft Test Guide for Quantum Key Distribution System as per the TEC GR No.: 91000:2022 (Deadline for submission of stakeholder comments on email to adgqt.tec-dot@gov.in is 10 Jan 2023)
27-12-2022
10-01-2023
8
Audio-Visual content Accessibility Roadmap for India
16-11-2022
15-12-2022
9
Discussion Paper on ‘Radio Frequency (RF) Electromagnetic Field (EMF) Compliance Assessment of 5G Base Stations'
09-11-2022
31-12-2022
10
Revision/Re-affirmation of Standards for GRs of Tx division
12-09-2022
22-09-2022
11
The stakeholder consultations on Draft ITSAR of 5G SEPP on 11.08.2022
20-07-2022
09-08-2022
12
The stakeholder consultations on Draft ITSAR of 5G SCP on 11.08.2022
20-07-2022
09-08-2022
13
The stakeholder consultations on Draft ITSAR of 5G N3IWF on 11.08.2022
20-07-2022
09-08-2022
14
The stakeholder consultations on Draft ITSAR of 5G NRF is scheduled to be held on 05-08-22
18-07-2022
02-08-2022
15
The stakeholder consultations on Draft ITSAR of 5G NEF is scheduled to be held on 05-08-22
18-07-2022
02-08-2022
16
The stakeholder consultations on Draft ITSAR of 5G NWDAF is scheduled to be held on 05-08-22
18-07-2022
02-08-2022
17
Draft ITSAR of 5G-UDM
08-07-2022
27-07-2022
18
Draft ITSAR of 5G-AuSF
08-07-2022
27-07-2022
19
Draft ITSAR of 5G SMF
08-07-2022
27-07-2022
20
Final draft document on National Plan for Distribution of Indian Standard Time to LSPs of DoT
21-06-2022
23-06-2022
21
Inputs invited on draft National Plan for Distribution of Indian Standard Time to Licensed Service Providers of DoT
03-06-2022
10-06-2022
22
Draft GR of Band Pass Filter
27-05-2022
10-06-2022
23
Notice for Stakeholder consultation User Plane Function(UPF) of 5G
06-05-2022
30-05-2022
24
Notice for Stakeholder consultation on Access and Mobility Management Function(AMF) of 5G
06-05-2022
27-05-2022
25
Draft Essential Requirements of Hybrid Set Top Box
28-04-2022
05-05-2022
26
Draft TSTP of Subscriber Management System (SMS)
25-03-2022
22-04-2022
27
Draft TSTP of Conditional Access System (CAS)
25-03-2022
22-04-2022
28
Draft ER of Hybrid Set Top Box
17-03-2022
25-03-2022
29
Inviting inputs for creating Framework for Fairness Assessment of AI/ML Systems #AIforAll
22-02-2022
25-03-2022
30
Inviting Nominations for “National Study Group on Open RAN”
07-01-2022
15-02-2022
31
Notice for Stakeholder consultation on ITSAR for Cell Broadcast Centre
28-01-2022
18-02-2022
32
Inviting comments on the Revised Draft TSTP of Conditional Access System (CAS) and Subscriber Management System (SMS)
11-01-2022
20-01-2022
33
Revised- notice for inviting the public comments on Adoption of TSDSI transposed 3GPP Rel 16 (16.2.0) standards
04-01-2022
03-02-2022
34
Inviting comments on the draft TSTP of Conditional Access System (CAS) and Subscriber Management System (SMS)
27-12-2021
07-01-2022
35
Notice for inviting comments and Sub-DCC & MF meeting of FA divison in respect of revision of Standard for ECR and EP
17-12-2021
03-01-2022
36
Notice for Stakeholder consultation on ITSAR for ISDN CPE(MCU) and draft ITSAR document
06-12-2021
23-12-2021
37
5G/5Gi trials test schedule and test procedure
29-10-2021
04-11-2021
38
Inviting the Public comments on Adoption of TSDSI transposed standards for 3GPP Release-15 into national standards by TEC
29-07-2021
28-08-2021
39
Draft ER of Router
24-05-2021
31-05-2021
40
Draft ER of COTS Server
19-05-2021
30-06-2021
41
Draft ER of Infiniband Switch
19-05-2021
31-05-2021
42
Inviting comments on the draft ER of IP Multimedia Conferencing Equipment
28/10/2020
08/11/2020
43
Online meeting to discuss Wi-Fi Access Point (AP) (TEC/GR/RS/WFS-003/10.XXX
2020